top of page

Our Work

At Watermaiden, we proudly showcase our recent projects and innovative work. Our portfolio highlights our commitment to quality and creativity, reflecting our dedication to exceptional results. Explore our visual journey and stay tuned for more inspiring creations!

01

Caustic Skid_edited.jpg

Caustic Neutralisation Skid

 A bespoke chemical dosing skid, which was designed, installed and operated to pacify  H2S gas, reduce phenols and neutralise the pH. This turned toxic chemicals into salty water, which could be flushed down the drain, resulting in zero waste.

02

Silt Managent - Desilting 

Silt and suspended solids were removed from hard to reach interceptor bays whilst still online. Geo bags and liners were used to significantly reduce the moisture content of the waste: reducing the number of tons of waste and avoided our customer paying to dispose of water. We managed the waste disposal also meaning this was a true cradle to grave service.

IMG-20250129-WA0037.jpg
Terratank TK808.png

03

Tank Cleaning 

During a tank cleaning project, one customer had a tank containing high value chemical solvent in it. Historically, the heel of the tank was slopped. We installed a temporary tank farm (even with a lined bund) and held the solvent in food-grade, stainless steel tanks which meant the solvent could be recovered at the end of the tank clean, resulting in a $700k recovery of solvent. We even pumped the solvent back into the tank via filters once we had completed the clean and drying of the tank.

04

Automated Bottoms Pumps

Watermaiden have pioneered a revolutionary solution with the Bottom Less-Standby Pump. These are used to transfer various liquids from one tank to another and are excellent for pumping of tank water heels unmanned. This combines different technology into a bespoke package that seamlessly offers safety standby free bottom pumping.

Auto Bottom new.png
IMG-20250224-WA0010(1).jpg

05

Line Clip Repairs

Numerous projects installing line clips on live running pipes. We excavated and installed a 36 inch line clip to a live 3 bar underground water pipe, whilst ensuring operations could still continue, with no disruptions. All whilst managing severe let-by with our dynamic range of pumps and hoses.

Click below, to see our work in action..

bottom of page